|
|
Consultant Reports
The reports below are available for download in Adobe Acrobat format (PDF). Some reports may take a minute or more to view please be patient.
Download times are based on loading the file directly into Acrobat Reader with a 56k modem. If you do not have Acrobat Reader you can obtain if free of charge by going to their web site at www.adobe.com
|
|
Updated June 25, 2009
| |
Nelson Aggregate Burlington Quarry Extension Traffic Study Update
(May 2009)
This recent update of the original Burlington Quarry Extension Traffic Study, prepared by Paradigm Transportation Solutions Limited, (June 2005) was completed at the request of the JART.
|
<Download>
|
| |
Nelson Aggregate Co. Response to Jart Report (February, 2009) This report prepared by Nelson and its technical experts provides comments on the JART Report of February 2009 Dated March 30, 2009
|
<Download>
|
| |
The Market for Crushed Stone in the GTA West and Economic Benefits of the proposed Nelson Burlington Quarry Extension, This report updates and supports information previously provided to JART in the October 2004 Planning Report; the March 22, 2005 response to JART (appendix B of the May 2006 reprint of the Planning Report); and Nelson's Response to the JART's key issues, January 16, 2008 Prepared by Altus Group Economic Consulting, December 2008
|
<Download>
|
| |
Community Liaison Committee Questionnaire
Please print and return, posted March 7th, 2008.
File size 105 Kb.
|
<Download>
|
| |
Burlington Quarry Extension Status Update
This document was distributed to attendees at the information session, February 12, 2008
|
<Download>
|
| |
Nelson Aggregate Co. – Burlington Quarry Extension Response to the Joint Agency Review Team Key Issues,
dated January 16, 2008
|
<Download>
|
| |
Burlington Quarry Extension Site Plans, prepared by MHBC Planning Limited,
dated January 11, 2008
Please note that these plans supercede the site plans dated April 5, 2006.
|
<Existing Features>
<Operational Plan>
<Rehabilitation Plan>
<Cross Sections>
|
| |
Adaptive Management Plan - Version 1, prepared by Golder Associates and Stantec Consulting in association with Savanta Inc., dated January 2008.
Please note this AMP supercedes Attachment 5 of Additional Hydrogeological Work Programs -Proposed Nelson Aggregate Co. Extension, compiled by Golder Associates, dated May 2006 and the Draft Adaptive Management Plan (Version 1), prepared by Golder Associates and Stantec Consulting in association with Savanta Inc., dated March 2007
|
<Download>
|
| |
Burlington Quarry Co. Burlington Quarry Extension Noise Impact Study (Revision 2), prepared by Aercoustics Engineering Limited, dated January 2, 2008
This report builds on the Noise Impact Study dated May 31, 2004, revised August 9, 2005 and the addendum to the Noise Impact Study dated May 9, 2006.
|
<Download>
|
| |
Nelson Aggregate filed the following collection of reports dated September 27, 2007 with JART “Reports Addressing the Hydrology and Ecology of Wetland Features Located on the Proposed Burlington Quarry Extension”. The reports include:
- Monthly Water Balances for Individual Wetland Areas – Golder Associates Ltd., Sept 2007
- Characterization of Shallow Overburden Hydrogeology at the Proposed Nelson Quarry Extension – Golder Associates Ltd., Sept 2007
- Wetland Ecological Effects Assessment Associated with Predicted Hydrologic Changes - Nelson Aggregate Co. Proposed Burlington Quarry Extension – Stantec Consulting Ltd. in association with Savanta Inc., Sept 2007
|
<Download>
|
| |
Addendum Report On Water Resources Impact Assessment & Contingency Design Updates
This addendum provides supporting information for the recently submitted Adaptive Management Plan and the Response to Joint Agency Review Team Key issues reports. This addendum provides updated information related to the revised extraction area of 51.6 hectares now proposed for the extension.
|
<Download>
This Report is 30 mgs & takes approximately 5 minutes to download "Be Patient"
|
| |
Nelson Aggregate Co., Burlington Quarry Extension Planning Report and Aggregate Resources Act Summary Statement prepared by MHBC Planning Limited Dated May 2006 and includeds Apendix B - MHBC Response to JART's questions, dated March 22, 2005
|
<Download>
This Report is 38 mgs & takes approximately 5 minutes to download "Be Patient"
|
|
|
Nelson Aggregate Co., Burlington Quarry Extension Agricultural Impact Assessment prepared by MHBC Planning Limited, Dated May 30, 2005
|
<Download>
|
|
|
Blasting Impact Assessment Proposed Nelson Aggregate Co.
Nelson Quarry Extension, prepared by Golder Associates, updated April 2006
|
<Download>
|
|
|
Burlington Quarry Extension - Blasting Assessment; New Residence Receptor Locator - dated December 13, 2004
File size: 4.5 Mb
|
<Download>
|
|
|
Air Quality Assessment of Nelson Quarry Co. Burlington Quarry Extension, Burlington, Ontario,
prepared by Golder Associates, dated August 2004 and reprinted
May 2006 to include Golder’s response to JART’s questions dated February, 2006 Dust Management Strategy for Nelson Aggregate by Golder Associates
This report consists of 3 downloads
|
<Download1>
<Download2>
<Download3>
|
|
|
Nelson Quarry Co. Burlington Quarry Extension Noise Impact Study, prepared by Aercoustics dated May 31, 2004, revised August 9, 2005 including the addendum to the Noise Impact Study dated May 9, 2006
This report consists of 2 downloads See Updated Document Above
|
<Download1>
<Download2>
|
|
|
Nelson Aggregate Co. Burlington Quarry Extension Traffic Study, prepared by Paradigm Transportation Solutions Limited,
updated June 2005
|
<Download>
|
|
|
Report on Hydrogeological and Water Resources Assessment of the Proposed Nelson Quarry Co. Extension,
prepared by Golder Associates dated October 2004 and reissued May 2006
This report consist of 2 downloads and requires winzip to
extract the pdf file
This report has been updated see Above
|
<Download>
<Download>
|
|
|
Additional Hydrogeological Work
compiled by Golder Associates, dated May 2006.
The additional work includes 5 Attachments below:
|
|
|
|
Attachment 1,
Golder Associates Limited September 16, 2005 Draft Peer
Review Responses to proposed Nelson Quarry Extension
This report consist of 3 downloads
|
<Text>
<Table>
<Figures>
|
|
|
Attachment 2
Golder Associates Limited, April 13, 2006 additional hydrogeological field studies at the proposed Nelson Aggregate Co. Quarry Extension
This report consist of 5 downloads
|
<Text>
<Appendix-A>
<Appendix-B>
<Appendix-C>
<Figures>
|
|
|
Attachment 3
Worthington, S., April 13, 2006. Karst investigations of the proposed Nelson Quarry Co. Extension
|
<Download>
|
|
|
Attachment 4
Golder Associates Limited, May 10, 2006 draft report on conceptual design of groundwater impact mitigation system, proposed Nelson Quarry Extension, Nelson Aggregate Co., Burlington, Ontario
This report consist of 4 downloads
This report has been superseded see Above
|
<Text>
<Appendix-A>
<Appendix -B>
<Figures>
|
|
|
Attachment 5
Golder Associates Limited May 10, 2006. Draft report on Adaptive Management Plan for local private wells (Version 1) proposed Nelson Aggregate Co. Extension Burlington Ontario
This report consist of 3 downloads
This report has been superceded see Above
|
<Text>
|
| |
Hydrogeological Peer Review Responses
Responds to technical questions raised by peer consultant, Mr. Chris Neville of S.S. Papadopulos regarding additional hydrogeologic field studies at the Proposed Nelson Quarry Co. Extension. Dated Aug 17, 2006
|
<Download>
|
| |
Karst Comments Responds to technical questions raised by peer reviewer regarding karst investigations dated Aug 25, 2006
|
<Download>
|
|
|
Archaeological Assessment (Stages 1, 2, 3) Nelson Aggregate Quarry Extension,
prepared by Archaeologix Inc., dated August 2003
|
<Download>
|
|
|
Archaeological Assessment (Stage 4) Nelson Aggregate Quarry Expansion,
prepared by Archaeologix Inc., dated August 2004
This report consists of 3 downloads
|
<Download1>
<Figures 5 & 6>
<Figures 9 & 10>
|
|
|
Draft Adaptive Management Plan Outline Ecological Component, Nelson Aggregate Co., Burlington Proposed Extension, prepared by Stantec, dated May 16, 2006 This report has been superceded see Above
|
<Download> |
|
|
Nelson Aggregate Co., Burlington Proposed Extension Level II Natural Environment Technical Report, prepared by Stantec. updatedMay 16, 2006 This report consists of 3 downloads
|
<Main Body> <Appendices>
|
| |
Natural Environment – Site Characterization Addendum - Responds to JART’s request for further studies to determine site characteristics of the proposed quarry lands. Dated Sept 29, 2006
|
<Download>
|
|
|
Notice of Expansion Map - a j-peg illustration depicting the proposed area of expansion of the Burlington Quarry.
|
<Download>
|
|
|
Year 2000 Inventory Report - an environmental inventory of the existing quarry.
Maximum Download time: 20 mins. (56k modem)
|
<Download>
|
|
|
Summary of Natural Heritage Features - Extension Lands - revised August 31st, 2004
Maximum Download time: 12 mins. (56k modem)
|
<Download>
|
|
|
Well Survey - participate in a local area survey of your well water.
|
<Download>
|
| |
For futher inquires contact:
propertymgr@nelsonaggregate.com
|
|
|